New build snagging checklist: how to snag a new home room by room

Updated 4 November 2026 · About a 10-minute read

A snag is any defect or unfinished job in a new home: a scratched window, a door that sticks, a missing bead of sealant. Snagging is going through the property methodically, writing each one down, and giving that snag list to the builder to put right.

This guide covers what to take, how to work through the house, and what to check in each room. The checklists are designed to print, so you can take them round with you. It is written for new homes, but the same method works for flats, refurbishments and commercial projects.

Contents

  1. When to snag
  2. What to take
  3. How to work through the house
  4. Outside
  5. Hall, stairs and landing
  6. Kitchen
  7. Bathrooms and en suites
  8. Living rooms and bedrooms
  9. Heating, electrics and plumbing
  10. Loft and garage
  11. After the inspection

When to snag

The best time is before you complete, if the developer allows a pre-completion inspection. It is easier to get things fixed before you have moved in and filled the rooms with furniture. If that is not possible, snag as soon as you get the keys, before the furniture arrives.

Most new homes in the UK come with a 10-year structural warranty, and in the first two years the builder is usually responsible for fixing defects. Check your own warranty documents for the exact terms. It is worth doing a second check, sometimes called a back snag, a few weeks after the builder says the first list is done. Do a final one before the two years are up, as some problems such as shrinkage cracks only show once the house has dried out.

What to take

How to work through the house

Outside

Hall, stairs and landing

Kitchen

Bathrooms and en suites

Living rooms and bedrooms

Heating, electrics and plumbing

Loft and garage

After the inspection

  1. Write it up straight away. Number every snag and include the photos, so the builder's site team can find each one.
  2. Send it in writing to the developer's customer care team, and keep a copy along with the date you sent it.
  3. Ask for a timescale for the repairs, and check the work when they say it is done.
  4. Back snag. Check each item off on the original list, and send a new list of anything still outstanding.
  5. Keep everything until the end of the builder's warranty period.